We were appointed to carry out alternative foundation system of bridges for one of the packages in DASH project near Sungai Buloh.
The original proposed foundation system is supported on bored pile. A cost-effective and faster construction time of foundation system was proposed after studying the designer’s requirements, bridge loadings and soil condition. The new foundation system consists of prestressed spun pile with pre-boring.
Here’s a look on the bridge construction after completion of the alternative foundation work.