Finally, the bridge protection work for the project last posted on 28 March 2018 had been completed. The final product is as shown in this photo.
It was a real challenge for the Contractor during the construction as the river water rises rapidly during heavy rainfall. The excavator needs to move out from the river before the rain comes.
All done now and the bridge will be well protected for many years to come!