Our 1st project in Kota Kinabalu, Sabah.
We design and supervise the post-tensioned (PT) piled raft foundation for one level basement building. Excavation depth reduced due to thinner PT piled raft slab compared to conventional pile cap and raft thickness.
Overall saving in time and cost as well as less complicated temporary earth lateral support system required.
If you are looking for value engineering on foundation system, please do contact us today!